Authors Germarié Viljoen and Felix Dube
Affiliation North-West University, South Africa
University of Pretoria South Africa
Email germarie.viljoen@nwu.ac.za and felix@fdube.co.za
Date Submitted 15 February 2023
Date Revised 10 July 2023
Date Accepted >10 July 2023
Date Published 23 November 2023
Guest Editors
Prof AA du Plessis and Prof LJ Kotze
Journal Editor Prof C Rautenbach
How to cite this contribution
Viljoen G and Dube F "Realising the Right to Electricity Through Off-Grid Power Solutions in South Africa " PER / PELJ 2023(26) - DOI http://dx.doi.org/10.17159/1727-3781/2023/v26i0a15637
Copyright
DOI http://dx.doi.org/10.17159/1727-3781/2021/v25i0a15637
Abstract
|
The South African government is navigating many basic |
---|
Keywords
Right to electricity; off-grid power, loadshedding, South Africa.
……………………………………………………….
1 Introduction
The short-lived Declaration of a National State of Disaster to curb the impact of electricity supply constraints in South Africa reveals severe challenges in providing a reliable and consistent supply of electricity.
1
Germarié Viljoen. LLB LM (cum laude) LLD (NWU). Associate Professor, Faculty of Law, North-West University, South Africa. Email: germarie.viljoen@nwu.ac.za. ORCiD: https://orcid.org/0000-0003-2986-6572. This work is based on research supported by the National Research Foundation (NRF) of South Africa and the Dutch Research Council (De Nederlandse Organisatie voor Wetenschappelijk Onderzoek) Project UID 129352. Any opinion, finding, conclusion or recommendation expressed in this contribution is that of the authors. Corrie Potgieter, Managing Director, Shangoni Management Services (Pty) Ltd is thanked for stimulating discussions that prompted research for this article. Felix Dube. LLB LLM LLD (NWU). Senior Lecturer: Department of Public Law, Faculty of Law, University of Pretoria, South Africa Email: felix@fdube.co.za. ORCiD: https://orcid.org/0000-0002-6490-4629. 1 The declaration of a state of disaster with regard to the electricity supply situation was gazetted in GN 3020 in GG 48009 of 9 February 2023. In the notice the Minister of Cooperative Governance and Traditional Affairs, who is responsible for the administration of the Disaster Management Act 57 of 2002, said that she declared the state of disaster regarding electricity after "[c]onsidering the magnitude, severity and progression of the severe electricity supply constraint and the substantial impact caused by the severe electricity supply constraint and following the classification of this electricity supply constraint by the Head of the Disaster Management Centre (CDMC) as a national state of disaster to prevent possible progression to a total blackout from occurring and taking into account the possibility to augment existing measures already undertaken by the organs of state to deal with electricity supply constraint". Although this paper reflects the legal position as of 13 February 2023, it is noteworthy that the declaration was eventually rescinded without any of its objectives being achieved, as is evident from the on-going constrained electricity supply situation in South Africa. 2 Chapter 1 of the Local Government: Municipal Systems Act 32 of 2000 (hereafter Municipal Systems Act) defines a basic municipal service as "a municipal service that is necessary to ensure an acceptable and reasonable quality of life and, if not provided, would endanger public health or safety or the environment". 3 See Pieterse 2020 Urban Forum for an exposition. 4 See Chamberlain and Masiangoako 2021 SALJ and Wright, Dube and Du Plessis 2022 VRÜ/WCL for a discussion. 5 See, for instance, Kgetlengrivier Concerned Citizens v Kgetlengrivier Local Municipality (UM 271/2020) [2020] ZANWHC 95 (18 December 2020); Concerned Citizen of Tswaing/SIBU v Local Municipality of Tswaing (1498/09) [2009] ZANWHC 17 (26 June 2009); Joseph v City of Johannesburg 2010 4 SA 55 (CC); Mazibuko v City of Johannesburg 2010 3 BCLR 239 (CC); Rademan v Moqhaka Local
Municipality 2013 4 SA 225 (CC); Federation for Sustainable Environment v Minister of Water Affairs (35672/12) [2012] ZAGPPHC 128 (10 July 2012).
such as the road and railway infrastructure are collapsing, South Africans have been hit hard by the consequences of unreliable electricity provision in recent times.
6
6 See SAICE 2022 https://saice.org.za/downloads/SAICE-2022-Infrastructure-Report-Card.pdf for an overview of the crumbling infrastructure in South Africa. While the reasons for Eskom's inability to supply electricity are many, we have elected not to traverse them in this paper, although it suffices to say that some of them can be traced to South Africa's historical planning of electricity infrastructure, the contemporary mismanagement of Eskom, and the country's misaligned priorities when it comes to energy. See Du Plessis Energy Law for an extensive examination of the energy situation in South Africa and the historical and current legal frameworks that govern it. 7 Coupled with a predetermined schedule, Eskom has published eight stages of load shedding, each stage representing the removal of 1000 megawatts (MW) increments of demand from the national grid. Stage three load shedding therefore means that up to 3000 MW of capacity are being shed.
The weak capacity of Eskom was confirmed more than two decades ago in the White Paper on Energy Policy of the Republic of South Africa,
8
8 Department of Minerals and Energy White Paper on Energy Policy. For a discussion of this paper, see Du Plessis 2015 South African Journal of Science 3-4. 9 Department of Minerals and Energy White Paper on Energy Policy para 7.1. The failure to provide for the growing demand in electricity was not only Eskom's fault. It is trite that Eskom was unable to add additional generating capacity to the grid and could therefore not keep up with the increasing national demand for electricity.
While the general reliability and sustainability of basic municipal services
10
10 While Eskom generates electricity, municipalities reticulate the electricity to consumers as part of the provision of basic municipal services, which include waste collection, the provision of water and promulgating building regulations – see schs 4
and 5 (Parts B) of the Constitution of the Republic of South Africa, 1996 (hereafter the Constitution). For this reason it is difficult, if not entirely impossible, to dichotomise the failure of Eskom to provide a reliable electricity supply without contextualising its impact on the ability of municipalities to provide basic municipal services such as electricity.
traditional public municipal services, which are left in a vacuum, and private or self-help service delivery alternatives continues to grow. Green-building
11
11 Green-building is generally associated with environmentally sustainable building designs that are meant to improve water quality and reduce energy use and waste. Its aim is to conserve non-renewable natural resources at the household and local government levels - see, in general, Wessels "Green Building" for a full exposition of the meaning of green building and its associated environmental benefits. 12 Radley and Lehmann-Grube 2022 Energy Research and Social Science 1.
To date, research on off-grid solutions has primarily focussed more on rural areas and less on urban areas because cities and towns mostly had a reliable and consistent supply of electricity, unlike their rural counterparts, some of which were not connected to the grid at all. Thus, this paper arrives at an opportune moment, considering the scale of South Africa's municipal service delivery failures and the general impact of Eskom's electricity supply deficit. However, the possibility for consumers to transition from connection to the national grid to going off-grid is a matter of debate, as seen in this paper. Against this background, the paper delves into the complexities of energy governance in South Africa, specifically addressing the fact that the past paradigm of complete reliance on Eskom is changing.
The discussion is structured as follows: the first part introduces and contextualises the traditional legal framework on utility rights. It situates access to electricity as a fundamental human right within South Africa's constitutional framework and links it to the right to adequate housing and
the fulfilment of various socio-economic rights. In the context of the legal framework, which entitles local communities to receive basic municipal services, we posit that in specific circumstances communities can take their own initiatives to fulfil their own rights. The second part provides a brief overview of off-grid options that may be used to fulfil energy needs in times of crises like loadshedding. The third part examines whether South Africa's law allows individual households to generate their own power and to effectively disconnect their properties from the grid and, if so, whether the regulatory framework is suitably tailored to effectively empower individual households to generate their own power. The discussion unlocks significant opportunities and potential challenges for local government in support of the changing governance regime. While this paper cautions against the view that grid independence overrides existing traditional municipal services and law, it highlights developments in the energy governance sector that may curb electricity provision challenges.
We dedicate this contribution to Professor Willemien du Plessis (Faculty of Law, North-West University), for her significant scholarly contributions to the field of energy law in South Africa. Her research established a nexus between energy, the environment and natural resources. This contribution to the PER Special Issue in her honour continues to promote sustainable energy sources and to reduce the country's dependence on fossil fuels amidst South Africa's ongoing electricity crisis.
2 The constitutional and statutory framework for the provision of electricity services
The democratic South African government is committed to improving the quality of life of everyone.
13
13 In this regard see the preambular aspiration in the Constitution. 14 See Dube and Moyo 2022 PELJ 9, quoting Makeshift 1190 (Pty) Ltd v Cilliers 2020 3 All SA 234 (WCC) para 34.
which Yacoob J held that the right of access to adequate housing entails more than "bricks and mortar" and that:
It requires available land, appropriate services such as the provision of water and the removal of sewage and the financing of all of these, including the building of the house itself. For a person to have access to adequate housing all of these conditions need to be met: there must be land, there must be services, there must be a dwelling.
15
15 Government of the Republic of South Africa v Grootboom 2000 11 BCLR 1169 (CC) para 35 (emphasis added). This interpretation of the right to access to adequate housing, which includes services such as water, resembles the approach in CESCR General Comment No 4: The Right to Adequate Housing (Art 11(1) of the Covenant) UN Doc E/1992/23 (1991) Annex III para 8(b).
Accordingly, beneficiaries of the right to adequate housing must have access to safe drinking water, energy for cooking, heating and lighting, sanitation and washing facilities.
16
16 For a further exposition of the requirements of an adequate house, also see Residents of Joe Slovo Community, Western Cape v Thubelisha Homes 2010 3 SA 454 (CC) para 10. In Daniels v Scribante 2017 4 SA 341 (CC) paras 209-210 the court said that the test for an adequate house is whether it would not cause the occupier to live in indignity.
The main statute regulating electricity and electricity services in South Africa is the ERA, the long title of which stipulates the objectives to establish a legal framework for the electricity supply industry; to make the National Energy Regulator the custodian and enforcer of the national electricity regulatory framework;
17
17 The National Energy Regulator Act 4 of 2004 (hereafter the ERA) established the National Energy Regulator. 18 See the long title of the ERA. 19 Section 2(a) of the ERA. 20 Section 2(b) of the ERA. 21 Section 2(d) of the Constitution.
customer choice.
22
22 Section 2(f) of the ERA. 23 See ss 27(d) and (f) of the ERA. In terms of ss 7, 8(1) and 22(1) of the Infrastructure Development Act 23 of 2014, the infrastructure that supports electricity distribution throughout South Africa is designated as a strategic integrated project. 24 This relationship between municipalities and individuals is unique as electricity services have a public law nature. (The public nature of electricity services has been confirmed in Joseph v City of Johannesburg 2010 4 SA 55 (CC).) Muller and Viljoen argue that once the infrastructure is constructed, end users - including households - may obtain access to the electricity infrastructure from their homes through servitudes registered against the title deeds of their properties. Muller and Viljoen Property in Housing 192.
The obligation to realise access to electricity in tandem with other basic services is further fleshed out and assigned to local government in terms of the Housing Act 107 of 1997 and the Local Government: Municipal Systems Act 32 of 2000. Notably, the Local Government: Municipal Finance Management Act 56 of 2003 and the Local Government: Municipal Property Rates Act 6 of 2004 are also applicable in the delivery of services by municipalities, as they prescribe the use of municipal finances as well as the procedures and principles for setting municipal rates (including electricity rates), respectively.
Although municipalities are constitutionally responsible for the reticulation of electricity to households and other consumers,
25
25 Section 153 of the Constitution places the responsibility on municipalities to prioritise and ensure the provision of basic services to communities, which includes electricity reticulation – see schs 4 and 5 of the Constitution. 26 The most recent case in this regard is Eskom Holdings SOC Ltd v Resilient Properties (Pty) Ltd; Eskom Holdings SOC Ltd v Sabie Chamber of Commerce and Tourism; Chweu Local Municipality v Sabie Chamber of Commerce and Tourism 2021 1 All SA 668 (SCA). For other cases in which Eskom threatened to cut off entire municipalities for failure to pay, see Unemployed Peoples Movement v Eastern Cape
Premier 2020 3 SA 562 (ECG) para 69 and Coetzee v Premier, Mpumalanga Province (High Court, Gauteng Division) (unreported) case number 2799/2017 of 6 April 2018. For a discussion of the role of the courts in matters regarding energy, see in general Du Plessis 2018 SAJELP.
the supply of electricity has serious negative financial consequences on Eskom, as it is unable to pay its suppliers, service its debt and pay for day-to-day operations.
27
27 For a full discussion of this challenge, see Eskom Holdings SOC Ltd v Resilient Properties (Pty) Ltd; Eskom Holdings SOC Ltd v Sabie Chamber of Commerce and Tourism; Chweu Local Municipality v Sabie Chamber of Commerce and Tourism 2021 1 All SA 668 (SCA), which also dealt with the legality of Eskom's attempts to recover amounts due to it from municipalities through cutting off supply.
The failure of Eskom to provide a reliable electricity supply potentially violates the Bill of Rights in that the enjoyment of many socio-economic rights depends on the availability of a consistent, reliable and uninterrupted supply of electricity.
28
28 See Dube and Moyo 2022 PELJ 9. 29 See Joseph v City of Johannesburg 2010 4 SA 55 (CC) paras 21-22.
3 Off-grid energy developments and options
Off-grid energy solutions continue to develop and are increasingly useful when the national power grid is offline for parts of the country. Several network configurations can be identified. The first entails off-grid systems or stand-alone systems which do not have any point of connection to the Eskom electricity distribution network. The second refers to standby or
back-up electrical systems that may or may not be tied to the grid. The third option entails grid-tied networks that provide electricity when required but are not designed to export energy into the Eskom power grid.
30
30 The latter system is attractive because it provides a fallback to the main grid should there be unexpected interruptions or in instances where the power consumed by appliances may overrun the system. 31 As suggested above, this contribution understands going "off-grid" as a consumer's election to disconnect him/herself from the grid completely or to rely on the grid only in times of emergency. Its main advantage is that it enables households to offload excess power that they generate into the main grid so that they generate some income. However, this system has its own costs in that operators must pay service fees to their municipalities to maintain their connections and for all electricity consumed from the main grid - Eskom 2022 https://www.eskom.co.za/distribution/ small-scale-embedded-generators/#Licensing. 32 Eskom 2022 https://www.eskom.co.za/distribution/small-scale-embedded-generators/#Licensing.
As will be argued in more detail below, off-grid energy solutions in the form of small-scale embedded generation (SSEG) systems present some opportunities to emerge from the country's energy crisis. SSEG systems refer to power generation facilities which households and some commercial entities can purchase to generate electricity on the customer's side of the municipal electricity meter to use independently from the state's electricity grid. SSEGs are connected and synchronised with the municipal grid, i.e., embedded, and typically include diesel generators, biogas, battery and solar installations.
33
33 SALGA 2020 https://www.sseg.org.za/wp-content/uploads/2018/10/SALGA-Status-of-SSEG_2020.pdf. 34 As per the definition in NRS 097-2-1:2017, it may be necessary for households who want to remain connected to the grid, as Eskom is likely to require them to use equipment and professional services that meet all these standards. 35 Static power converters are also used to convert, for example, wind power, battery storage and micro-hydro power to grid-compatible electricity. See NRS 097-2.
Solar photovoltaic technology may be utilised as an SSEG installation that converts and stores direct current (DC) electricity to alternating current (AC) electricity, which the electrical grid uses. Photovoltaic panels are particularly
attractive in many parts of South Africa due to the country's relatively sunny weather for most parts of the year:
36
36 Once procured, off-grid solar energy is relatively affordable and provides a consistent and (mostly) uninterrupted supply, but only to the extent that the sun is available and when proper energy storage systems like batteries are used. Although consumers in most provinces will benefit from going off-grid, some will be particularly vulnerable due to mostly overcast winters during which solar energy will be intermittent, such as in the Western Cape.
South Africa's solar resource potential is amongst the highest in the world, with most areas in the country averaging two thousand five hundred (2 500) hours of sunshine per year, combined with high solar irradiation levels (between 4.5 and 6.5 kWh/m2 per day). Six (6) provinces host solar power projects.
37
37 Mantashe 2022 https://www.gov.za/speeches/remarks-honourable-minister%C2% A0%C2%A0mineral-resources-and-energy%C2%A0mr-samson-gwede-mantashe%C2%A0-solar#:~:text=South%20Africa%27s%20solar%20resource%20potential,provinces%20host%20solar%20power%20projects.
For many households, the choice of which photovoltaic off-grid solar solution to procure depends on several factors, such as its initial cost of purchase and installation, safety and compliance with standards and laws, scalability, reliability, and compatibility with all other systems.
38
38 Since all systems need maintenance, off-grid power supply solutions have the added costs of maintenance, whether one is connected to the grid or not. As a result, off-grid solutions provide greater levels of electricity availability than Eskom but may be costly to procure, install and maintain. Also, households need to replace their lights with more energy-efficient LED lights and procure home appliances that are rated highly for efficiency, as this will ultimately reduce the initial costs of procuring off-grid solutions and maintaining them. Another hidden cost in this regard is replacing electrical cooking and heating appliances with their gas counterparts and converting geysers from electricity into solar to maximise the benefits of going off-grid. The diversification of lighting, cooking and heating in the use of off-grid solutions ensures a mixture of energy sources to provide a high measure of reliability and efficiency, thus mitigating the challenges of solar intermittence. While homeowners enjoy considerable latitude in determining how best to live their lives in their homes as far as which energy sources to use to power their appliances, the use of off-grid solutions is not without regulations, as various laws apply to their procurement, maintenance and use. The following section looks at the main laws that deal with off-grid solutions.
Households will need to purchase SSEG installations whose specifications are approved by the South African Bureau of Standards, and solar panels that comply with International Electrotechnical Commission standards.
39
39 However, the NRS 097-2-1:2017 is not a law in South Africa - Eskom 2020 https://www.sseg.org.za/wp-content/uploads/2017/01/NRS-097-2-1-2017-Edition-2.1-published-2020-07-20.pdf 2.
National Standard (SANS) standards.
40
40 See, for instance, ss 4 and 5 of the Oudtshoorn Local Municipality: Solar Water Heating By-law, 2009. 41 It may be necessary for households who want to remain connected to the grid, as Eskom is likely to require them to use equipment and professional services that meet all these standards. See Eskom's guidelines at Eskom Date Unknown https://www.eskom.co.za/distribution/small-scale-embedded-generators/.
The NRS 097-2-1:2017 (edition 2.1)
42
42 Technical Governance Department "Grid Interconnection of Embedded Generation: Part 2: Small-Scale Embedded Generation".
the interface between the embedded generator [EG] and the utility, although it is expected that the specification will mainly apply to photovoltaic grid-connected systems interfaced through static power converter technology.
It also deals with the following:
b) embedded generator [EG] requirements, which deal with product type approval, installation requirements and certificate of compliance on the [energy generator's] side of the meter; and
c) simplified utility connection criteria, which deals specifically with the commonly designed unidirectional flow of energy in [low voltage] networks, with cumulative impacts of EGs, with substation configuration and metering arrangements.
43
43 Eskom 2020 https://www.sseg.org.za/wp-content/uploads/2017/01/NRS-097-2-1-2017-Edition-2.1-published-2020-07-20.pdf 5.
Although NRS 097-2-1:2017 provides valuable guidance as to the practical specifications to facilitate the incorporation or interconnection of EG to a utility network, it does not guarantee that the utility will allow the connection of the EG. As will be indicated below, additional requirements may, in certain instances, be set.
4 Legal reflections on the procurement, installation and maintenance of off-grid power solutions
4.1 National legislation
Section 8(2) of the ERA, read with Schedule 2 of the Act, exempts households with SSEG solutions from complying with the requirement to operate generation, transmission and distribution facilities and import and
export electricity without a licence issued by the National Energy Regulator of South Africa (NERSA).
44
44 Section 8(2) of the ERA. 45 GN 2875 in GG 47757 of 15 December 2022; SALGA 2020 https://www.sseg.org.za/wp-content/uploads/2018/10/SALGA-Status-of-SSEG_2020.pdf. 46 See para 2.1 of SALGA 2020 https://www.sseg.org.za/wp-content/uploads/2018/10/SALGA-Status-of-SSEG_2020.pdf. 47 Schedule 2.2 in GN 2875 in GG 47757 of 15 December 2022 ;GN 3020 in GG 48009 of 9 February 2023 48 Schedule 2.3 in GN 2875 in GG 47757 of 15 December 2022.
The foregoing licensing exemptions show that households and businesses that do not feed into the grid need not obtain licensing. However, Eskom customers that have grid-connected SSEG systems must meet the necessary NERSA licence or registration requirements.
49
49 NERSA will require information from Eskom to ensure that a grid connection is possible. Customers must apply to Eskom to become grid-tied, pay the quoted fees, and sign the required Eskom agreements. Eskom 2022
https://www.eskom
.co.za/distribution/small-scale-embedded-generators/#Licensing. 50 Eskom 2022 https://www.eskom.co.za/distribution/small-scale-embedded-generators/#Licensing.
Since off-grid solutions could be classified as renewable energy systems because of their reliance on solar, wind and other renewable sources of energy, several environmental and other legislative instruments might be applicable. The National Environmental Management Act 107 of 1998 (hereafter NEMA), in conjunction with several Listing Notices,
51
51 Environmental Impact Assessment Regulations Listing Notice 1 and 2 (GN R984 in GG 32838 of 4 December 2014).
infrastructure that generate electricity but only to the extent that such renewable energy generation exceeds 10MW and is less than 20MW. Since many off-grid solutions cater for commercial operations and individual houses and apartment buildings, it is unlikely that they will exceed the 10MW threshold.
52
52 On 8 September 2022 the Minister of Forestry, Fisheries and the Environment published a notice excluding the development and expansion of solar PV facilities, including any associated activity or infrastructure from the requirement to obtain environmental authorisation in terms of the National Environmental Management Act 107 of 1998: GN 2466 in GG 46871 of 8 September 2022.
4.2 Municipal by-laws
As argued in the second part of this paper, the role of local government, which is vested with the provision of basic services, is crucial in creating a conducive environment for households to empower themselves in mitigating the unreliability of the state's electricity supply. Municipalities play their role in terms of Schedules 4B and 5B of the Constitution, which give them specific powers that may not be limited or removed by provincial and national governments. These include the reticulation of electricity, setting building regulations and municipal planning. In the present discussion on regulating off-grid solutions, municipalities hold enormous power in regulating the norms, standards and guidelines for saving energy and reducing electricity consumption and reliance on the grid. Municipalities exercise these powers through by-laws which regulate which consumers may generate electricity for themselves and for feeding into the grid.
53
53 The constitutional basis for the municipal power to adopt by-laws is derived from s 156 of the Constitution, which empowers municipalities to make and administer by-laws for the effective governance of their areas of jurisdiction. See, for example, ss 6-7 of the uMvoti Local Municipality: Electricity Supply By-laws, 2019; s 8 of the Kouga Local Municipality: Electricity By-law, 2021. 54 See, for instance, these websites: Polokwane Municipality Date Unknown Registration of Connected Small Scale Embedded Generators https://www.polokwane.gov.za/City-Documents/Shared%20Documents/COP%20Forms/Registration%20for%20Small-Scale%20Embedded%20Generation%20Form%202017.PDF accessed 11 March 2023; City of Cape Town Date Unknown Saving Electricity http://savingelectricity.org.za/ accessed 11 March 2023; Overstrand Municipality
Date Unknown Electricity http://www.overstrand.gov.za/en/documents/electricity accessed 11 March 2023.
Although domestic and commercial consumers may pursue off-grid solutions in response to the unreliability of Eskom's power supply, they will need the consent of their municipalities, which may permit them to procure off-grid power, provided that they comply with safety and quality guidelines.
55
55 See, for instance, s 8 of the Kouga Local Municipality: Electricity By-law, 2021; s 56 of the eMalahleni Local Municipality: Electricity By-laws, 2021; s 36(5) of the City of Matlosana Local Municipality: Electricity By-laws, 2022. 56 In this regard, examples include s 33 of the Oudtshoorn Local Municipality: Integrated Zoning Scheme By-law, 2021; s 31 of the Cape Agulhas Local Municipality: Zoning Scheme By-law, 2022; s 32 of the Beaufort West Local Municipality: Zoning Scheme By-law, 2022; s 32 of the Cederberg Local Municipality: Zoning Scheme By-law, 2020. 57 See, for example, s 39 of the George Local Municipality: Electricity Supply By-law, 2010; s 36 of the City of Matlosana Local Municipality: Electricity By-laws, 2022.
Several municipal by-laws regulate embedded energy generation and the connection of energy generation equipment to the grid in accordance with specific legislation.
58
58 The Occupational Health and Safety Act 85 of 1993 is one of the statutes referred to in the by-laws of different municipalities which regulate embedded power generation. 59 See, for instance, s 64(1) of the Overstrand Local Municipality: By-law Relating to Electricity Supply, 2016; s 64 of the Langeberg Local Municipality: Standard By-law Relating to Electricity Supply, 2018; s 62 of the Saldanha Bay Local Municipality: Electricity Supply By-law, 2022. 60 See s 8 of the Overstrand Local Municipality: By-law Relating to Electricity Supply, 2016.
In accordance with Schedule 4B of the Constitution, which lists the functional areas of municipalities, section 4 of the National Building Regulations and Standards Act 103 of 1997
61
61 National Building Regulations and Standards Act 103 of 1977.
30 days prior to the commencement of construction, while 60 days applies to larger buildings. Applications for such plans should include site plans, layout drawings, installation drawings, and other information on the installations to be made on such buildings, such as solar panels.
62
62 See, for instance, s 4 of the Oudtshoorn Local Municipality: Solar Water Heating By-law, 2009, which stipulates the information to be disclosed in building plans with regard to the description of any solar water heating systems. 63 See, for instance, ch VI s 20 of the eThekwini Metropolitan Municipality: Water Supply By-laws, 1996 as amended. 64 See, for example, the City of Tshwane Metropolitan Municipality: Green Building Development By-law, 2012, which stipulates that: "All new buildings, refurbishments and major retrofits should ensure that at least 10% of energy consumption is generated from renewable energy systems. This requirement can be met by installing renewable energy systems such as photovoltaic and solar water heating systems in buildings or on-site."
5 The local government conundrum: opportunities and challenges in a time of change
In considering the foregoing legal requirements and exemptions for SSEGs as off-grid solutions, it is necessary to bear in mind that municipalities are responsible for the reticulation of electricity to consumers and that they hold enormous power in determining various aspects of off-grid power solutions along national standards which set the specifications. Besides creating an enabling regulatory framework for the provision and acquisition of off-grid solutions, they have a further duty to provide a conducive environment for households that can procure off-grid solutions to do so. In this regard we refer to the City of Cape Town's initiatives.
In its endeavour to accelerate SSEGs through off-grid options, the City of Cape Town recently announced several incentives for consumers who procure off-grid solutions and who save electricity during peak times. Its ambitious plan in this regard entails buying surplus energy at approved City SSEG feed-in tariffs. According to the recent announcement by the City, eligible commercial electricity customers will be able to choose to be compensated in either an off-set credit against the existing electricity
account, an off-set credit against another municipal account in a customer's name, or in payment.
65
65 See the announcement by City of Cape 2023 https://www.capetown.gov.za/Media-and-news/Cash%20for%20power%20Cape%20Town%20gets%20Treasury% 20exemption%20to%20pay%20businesses%20and%20residents%20directly. Also see City of Cape Town 2023 https://www.capetown.gov.za/Media-and-news/How%20to%20get%20cash%20for%20power.
This development is significant as it recognises the need for a just energy transition (JET) which sets ambitious targets for the country's renewable energy sector. The JET aims to ensure that the country's transition to a low-carbon and sustainable energy system is fair and equitable for all citizens. However, it should be noted that neither of these municipal initiatives produces large-scale additional power - this comes only from utility-scale generation plants. Also, it is a fundamental aspect of the JET that it seeks to ease the transition away from coal and to support those working in the coal industry in the transition. For this reason it may be said that it is not entirely pro-renewables.
Off-grid energy solutions play a vital role in improving access to electricity in South African communities. Naturally, SSEGs and renewable energy options also have relevance in terms of section 24 of the Constitution, as they facilitate a shift away from coal-fired power generation, which is responsible for environmental pollution and degradation.
66
66 Going off-grid also plays a vital role in improving the country's economic development and standard of living through access to electricity. 67 UN Transforming Our World. 68 See UNEP 2022 http://www.unep.org/explore-topics/sustainable-development-goals/why-do-sustainable-development-goals-matter/goal-7 for the specific targets under SDG 7.
However, the developmental role of local government should not be interpreted to only advance and accelerate in an unbalanced fashion. The fact remains that most of the revenue that municipalities obtain comes from
the profits they make from selling electricity to consumers. This revenue is critical for the sustainability of municipalities such that without it, most are bound to collapse. Hence, while going off the grid is beneficial for the individuals who can afford it, the introduction of SSEGs with the aim of ultimately overriding grid reliance will be disastrous for the broader society because municipalities heavily rely on profit from electricity reticulation revenue to provide for services. This was recently illustrated by the Makana case, in which the municipality was using electricity revenue to provide for the indigent and to finance other programmes, such that when Eskom threatened to cut off power due to non-payment, the municipality "diverted its budget and ringfenced some funds for Eskom, leaving gaps in the provision of other services".
69
69 Wright, Dube and Du Plessis 2022 VRÜ/WCL 109. Also see Unemployed Peoples Movement v Eastern Cape Premier 2020 3 SA 562 (ECG) para 69.
6 Concluding remarks
This paper explores the exigency for consumers to go off-grid for their electricity needs due to the failure of Eskom to provide an uninterrupted supply of electricity. The paper locates access to electricity as a statutory utility right in South Africa's human rights discourse by contextualising it with constituent elements of the constitutional right to access adequate housing – one of the main elements of which is access to a reliable and interrupted supply of electricity. Whereas electricity supply is a basic municipal service to which communities are entitled, its uniqueness lies in its role in fulfilling almost all socio-economic rights, including access to water and sanitation. For urban and semi-urban households and commercial customers, access to electricity is not only a basic utility right which consumers are entitled to have realised by their municipalities but also a question of the autonomy to decide on what systems they should use to power their homes and businesses, particularly at present, when municipalities cannot provide reliable and consistent supplies of electricity due to Eskom's inability to generate consistent power.
We identified several statutes which regulate how one may obtain access to services like electricity. The regulatory framework creates specific
relationships between municipalities and individuals by mandating municipalities to facilitate access to electricity. The regulatory framework confirms that municipal services are essential in exercising housing rights, such as electricity. In the context of South Africa's service delivery challenges and the ensuing energy crisis, this paper further reveals that the legal framework does not prohibit households from going off-grid. Hence, the legal context in which households seek alternative off-grid power reiterates the centrality of access to electricity in the fulfilment of the Bill of Rights, particularly of the socio-economic rights, and the obligation of the state to provide a conducive regulatory environment in which consumers may contribute to fulfilling their right to electricity where the state is unable to do so. This requires legislation to accommodate the needs of consumers to go off-grid. The recent declaration of a state of disaster regarding electricity and the ensuing tax and other incentives for procuring solar panels will go a long way towards helping consumers to go off-grid or at least to substantially reduce their reliance on the grid.
However, the ERA, which is the main statute on the supply of electricity, does not provide for off-grid solutions. Other relevant statutes such as environmental legislation also do not apply to SSEGs by households and commercial consumers. This means that within limits consumers may generate their own electricity using renewable sources and may even export surpluses to the grid. The conditions under which they can do so are set by municipalities through by-laws which prescribe energy saving, the reduction of reliance on the grid, and the household generation and export of electricity into the grid. The by-laws set out that energy generation infrastructure that is connected to the grid must be installed only after obtaining municipal consent, among other requirements.
We conclude that national legislation and municipal by-laws provide detailed specifications for the procurement, installation and maintenance of off-grid systems by prescribing industry standards for product specifications. Hence, municipalities play a central role in ensuring that as consumers go off-grid, they adhere to norms and standards on the operation of electricity infrastructure. The move towards off-grid solutions represents a transformative approach to energy governance in that while it affirms the state's obligation to provide energy for households, it also opens the possibility for households to realise their own energy rights by going off-grid to mitigate the incapacity of the state to meet their needs. In the result, we identify the developmental role of local government in the context of changing energy governance in South Africa as a main driver of empowering households to go off-grid. While the realities of South African
municipalities, as reflected in case law, make one caution against the view that grid independence overrides existing traditional municipal services and law, they highlight developments in the local energy governance sector that may curb the existing challenges to the provision of electricity.
Bibliography
Literature
Chamberlain and Masiangoako 2021 SALJ
Chamberlain L and Masiangoako T "Third Time Lucky? Provincial Intervention in the Makana Local Municipality" 2021 SALJ 423-459
Department of Minerals and Energy White Paper on Energy Policy
Department of Minerals and Energy White Paper on the Energy Policy of the Republic of South Africa (Department of Minerals and Energy Pretoria 1998)
Du Plessis 2015 South African Journal of Science
Du Plessis W "Energy Efficiency and the Law: A Multidisciplinary Approach" 2015 South African Journal of Science 1-8
Du Plessis 2018 SAJELP
Du Plessis W "Energy Efficiency: The Progress of Policy, Legislation, and the Role of the Courts" 2018 SAJELP 175-203
Du Plessis Energy Law
Du Plessis W Energy Law in South Africa (Kluwer Alphen aan den Rijn 2020)
Dube and Moyo 2022 PELJ
Dube F and Moyo C "The Right to Electricity in South Africa" 2022 PELJ 1-21
Muller and Viljoen Property in Housing
Muller G and Viljoen S-M Property in Housing (Juta Cape Town 2021)
Pieterse 2020 Urban Forum
Pieterse M "Anatomy of a Crisis: Structural Factors Contributing to the Collapse of Urban Municipal Governance in Emfuleni, South Africa" 2020 Urban Forum 1-15
Radley and Lehmann-Grube 2022 Energy Research and Social Science
Radley B and Lehmann-Grube P "Off-Grid Solar Expansion and Economic Development in the Global South: A Critical Review and Research Agenda" 2022 Energy Research and Social Science 1-15
UN Transforming Our World
United Nations Transforming Our World: The 2030 Agenda for Sustainable Development (UN New York 2015)
Wessels "Green Building"
Wessels J-A "Green Building" in Du Plessis AA (ed) Environmental Law and Local Government in South Africa 2nd ed (Juta Cape Town 2021) ch 25
Wright, Dube and Du Plessis 2022 VRÜ/WCL
Wright J, Dube F and Du Plessis A "Judicial Enforcement of Mandatory Provincial Interventions in Municipalities in South Africa" 2022 VRÜ/WCL 105-125
Case law
Coetzee v Premier, Mpumalanga Province (High Court, Gauteng Division) (unreported) case number 2799/2017 of 6 April 2018
Concerned Citizen of Tswaing/SIBU v Local Municipality of Tswaing (1498/09) [2009] ZANWHC 17 (26 June 2009)
Daniels v Scribante 2017 4 SA 341 (CC)
Eskom Holdings SOC Ltd v Resilient Properties (Pty) Ltd; Eskom Holdings SOC Ltd v Sabie Chamber of Commerce and Tourism; Chweu Local Municipality v Sabie Chamber of Commerce and Tourism 2021 1 All SA 668 (SCA)
Federation for Sustainable Environment v Minister of Water Affairs (35672/12) [2012] ZAGPPHC 128 (10 July 2012)
Government of the Republic of South Africa v Grootboom 2000 11 BCLR 1169 (CC)
Joseph v City of Johannesburg 2010 4 SA 55 (CC)
Kgetlengrivier Concerned Citizens v Kgetlengrivier Local Municipality (UM 271/2020) [2020] ZANWHC 95 (18 December 2020)
Makeshift 1190 (Pty) Ltd v Cilliers 2020 3 All SA 234 (WCC)
Mazibuko v City of Johannesburg 2010 3 BCLR 239 (CC)
Rademan v Moqhaka Local Municipality 2013 4 SA 225 (CC)
Residents of Joe Slovo Community, Western Cape v Thubelisha Homes 2010 3 SA 454 (CC)
Unemployed Peoples Movement v Eastern Cape Premier 2020 3 SA 562 (ECG)
Legislation
Beaufort West Local Municipality: Zoning Scheme By-law, 2022
Cape Agulhas Local Municipality: Zoning Scheme By-law, 2022
Cederberg Local Municipality: Zoning Scheme By-law, 2020
City of Matlosana Local Municipality: Electricity By-laws, 2022
City of Tshwane Metropolitan Municipality: Green Building Development By-law, 2012
Constitution of the Republic of South Africa, 1996
Disaster Management Act 57 of 2002
Electricity Act 41 of 1987
Electricity Regulation Act 4 of 2006
eMalahleni Local Municipality: Electricity By-laws, 2021
eThekwini Metropolitan Municipality: Water Supply By-laws, 1996 as amended
George Local Municipality: Electricity Supply By-law, 2010
Housing Act 107 of 1997
Infrastructure Development Act 23 of 2014
Kouga Local Municipality: Electricity By-law, 2021
Langeberg Local Municipality: Standard By-law Relating to Electricity Supply, 2018
Local Government: Municipal Finance Management Act 56 of 2003
Local Government: Municipal Property Rates Act 6 of 2004
Local Government: Municipal Systems Act 32 of 2000
National Building Regulations and Standards Act 103 of 1977
National Energy Act 34 of 2008
National Energy Regulator Act 4 of 2004
National Environmental Management Act 107 of 1998
Nuclear Energy Act 46 of 1999
Occupational Health and Safety Act 85 of 1993
Oudtshoorn Local Municipality: Electricity Supply By-law, 2009
Oudtshoorn Local Municipality: Integrated Zoning Scheme By-law, 2021
Oudtshoorn Local Municipality: Solar Water Heating By-law, 2009
Overstrand Local Municipality: By-Law Relating to Electricity Supply, 2016
Saldanha Bay Local Municipality: Electricity Supply By-law, 2022
uMvoti Local Municipality: Electricity Supply By-laws, 2019
Government documents
GN R984 in GG 32838 of 4 December 2014 (Environmental Impact Assessment Regulations Listing Notice 1 and 2)
GN 2466 in GG 46871 of 8 September 2022
GN 2875 in GG 47757 of 15 December 2022
GN 3020 in GG 48009 of 9 February 2023
International instruments
CESCR General Comment No 4: The Right to Adequate Housing (Art 11(1) of the Covenant) UN Doc E/1992/23 (1991) Annex III
Internet sources
City of Cape Town Date Unknown http://savingelectricity.org.za/
City of Cape Town Date Unknown Saving Electricity http://savingelectricity.org.za/ accessed 11 March 2023
City of Cape Town 2023 https://www.capetown.gov.za/Media-and-news/Cash%20for%20power%20Cape%20Town%20gets%20Treasury%20exemption%20to%20pay%20businesses%20and%20residents%20 directly
City of Cape Town 2023 Cash for Power: Cape Town Gets Treasury Exemption to Pay Businesses and Residents Directly https://www.capetown.gov.za/Media-and-news/Cash%20for%20power%20Cape%20Town%20gets%20Treasury%20exemption%20to%20pay%20businesses%20and%20residents%20directly accessed 13 March 2023
City of Cape Town 2023 https://www.capetown.gov.za/Media-and-news/How%20to%20get%20cash%20for%20power
City of Cape Town 2023 How to Get Cash for Power https://www.capetown.gov.za/Media-and-news/How%20to%20get%20 cash%20for%20power accessed 11 March 2023
Eskom Date Unknown https://www.eskom.co.za/distribution/small-scale-embedded-generators/
Eskom Date Unknown Small-Scale Embedded Generators https://www.eskom.co.za/distribution/small-scale-embedded-generators/ accessed 11 March 2023
Eskom 2020 https://www.sseg.org.za/wp-content/uploads/2017/01/NRS-097-2-1-2017-Edition-2.1-published-2020-07-20.pdf
Eskom Technical Governance Department 2020 Grid Interconnection of Embedded Generation: Part 2: Small-Scale Embedded Generation https://www.sseg.org.za/wp-content/uploads/2017/01/NRS-097-2-1-2017-Edition-2.1-published-2020-07-20.pdf accessed 30 October 2022
Eskom 2022 https://www.eskom.co.za/distribution/small-scale-embedded-generators/#Licensing
Eskom 2022 Small-Scale Embedded Generation https://www.eskom.co.za/ distribution/small-scale-embedded-generators/#Licensing accessed 30 October 2022
Mantashe 2022 https://www.gov.za/speeches/remarks-honourable-minister%C2%A0%C2%A0mineral-resources-and-energy%C2%A0mr-samson-gwede-mantashe%C2%A0-solar#:~:text=South%20Africa%27s% 20solar%20resource%20potential,provinces%20host%20solar%20power%20projects
Mantashe G 2022 Solar Power Africa 2022 Conference CTICC https://www.gov.za/speeches/remarks-honourable-minister%C2%A0%C2%A0mineral-resources-and-energy%C2%A0mr-samson-gwede-mantashe%C2%A0-solar#:~:text=South%20Africa%27s% 20solar%20resource%20potential,provinces%20host%20solar%20power%20projects accessed 29 October 2022
Overstrand Municipality Date Unknown http://www.overstrand.gov.za/en/
documents/electricity
Overstrand Municipality Date Unknown Electricity http://www.overstrand .gov.za/en/documents/electricity accessed 11 March 2023
Polokwane Municipality Date Unknown https://www.polokwane.gov.za/City-Documents/Shared%20Documents/COP%20Forms/Registration%20for%20Small-Scale%20Embedded%20Generation%20Form%202017.PDF
Polokwane Municipality Date Unknown Registration of Connected Small Scale Embedded Generators https://www.polokwane.gov.za/City-Documents/Shared%20Documents/COP%20Forms/Registration%20for%20Small-Scale%20Embedded%20Generation%20Form%202017.PDF accessed 11 March 2023
SAICE 2022 https://saice.org.za/downloads/SAICE-2022-Infrastructure-Report-Card.pdf
South African Institution of Civil Engineering 2022 SAICE 2022 Infrastructure Report Card Card for South Africa https://saice. org.za/downloads/SAICE-2022-Infrastructure-Report-Card.pdf accessed 13 March 2023
SALGA 2020 https://www.sseg.org.za/wp-content/uploads/2018/10/ SALGA-Status-of-SSEG_2020.pdf
South African Law Government Association 2020 Status of Small-Scale Embedded Generation (SSEG) in South African Municipalities https://www.sseg.org.za/wp-content/uploads/2018/10/SALGA-Status-of-SSEG_2020.pdf accessed 13 March 2023
UNEP 2022 http://www.unep.org/explore-topics/sustainable-development-goals/why-do-sustainable-development-goals-matter/goal-7
United Nations Environment Programme 2022 GOAL 7: Affordable and Clean Energy http://www.unep.org/explore-topics/sustainable-development -goals/why-do-sustainable-development-goals-matter/goal-7 accessed 13 March 2023
List of Abbreviations
CESCR |
Committee on Economic, Social and |
---|---|
EG |
Embedded Generation |
ERA |
National Energy Regulator Act 4 of 2004 |
JET |
Just Energy Transition |
MW |
megawatt |
NEMA |
National Environmental Management Act 107 of 1998 |
NERSA |
National Energy Regulator of South Africa |
NRS |
National Reference Standard |
PELJ |
Potchefstroom Electronic Law Journal |
SAICE |
South African Institution of Civil Engineering |
SAJELP |
South African Journal of Environmental Law and Policy |
SALGA |
South African Law Government Association |
SALJ |
South African Law Journal |
SANS |
South African National Standards |
SDG |
Sustainable Development Goal |
SOC |
State-Owned Company |
SSEG |
Small-Scale Embedded Generation |
UN |
United Nations |
UNEP |
United Nations Environment Programme |
VRÜ/WCL |
Verfassung und Recht in Übersee (VRÜ) / World Comparative Law |